Back to RenoWise
Free · No signup · 2026 pricing

Renovation Cost Calculator Malaysia

An honest cost range for your kitchen, bathroom, full home, bedroom or paint job — adjusted for property, location and finish.

Instant
Updates live as you tweak inputs.
Realistic
Based on Malaysian 2026 build rates.
Transparent
See every ringgit broken down.
1

What are you renovating?

Pick the closest match.

2

Property & size

Drives the realistic build-cost band.

Room size120 sqft
3

Location

Costs vary 10-15% across Malaysia.

4

Finish quality

Materials & workmanship level.

5

What's included?

Toggle items that apply.

6

Timeline

Urgency adds a premium — contractors juggle existing jobs.

Estimated cost range
RM 89k
RM 71kRM 107k typical range
Cost breakdown
LabourRM 31,200
MaterialsRM 40,150
Design feeRM 6,250
ContingencyRM 11,600

Estimates are indicative — real quotes typically vary 20-30% depending on contractor, site conditions and material choices.

Get a real quote
Estimate
RM 89kRM 71kRM 107k
Get quote
FAQ

About the calculator

How accurate is the estimate?+
It is a planning range based on prevailing 2026 Malaysian renovation rates. Actual contractor quotes commonly vary 20-30% depending on contractor reputation, site conditions, and the specific brands or finishes you pick. Use this to set expectations and budgets, not to lock in a final number.
Why is there a low-mid-high range?+
No two contractors quote identically. The mid number is what we expect a typical Klang-Valley contractor to quote for a project this size and scope. The low and high reflect the realistic variance you should plan for when collecting 2-3 quotes.
What does each finish tier mean?+
Basic = ceramic tiles, laminate carpentry and off-the-shelf fittings. Mid-range = porcelain tiles, mixed solid/laminate carpentry, branded sanitary ware. Premium = natural stone, solid wood, designer fittings and custom millwork. The tier you pick shifts both materials and labour cost.
Why does the location change the cost?+
Labour rates and material logistics differ across Malaysia. Klang Valley is the baseline. Ipoh and JB are typically 5-12% cheaper. East Malaysia is usually about 10% higher due to shipping.
Why does urgent timing add 15%?+
Most reputable contractors run a 6-12 week pipeline. Asking them to slot you in immediately means overtime, expedited material orders, and pulling team off other jobs — that premium gets passed on.
Do I need to sign up to see the result?+
No. The estimator is fully free, no email needed, no account. We believe in transparency — you should be able to plan your renovation without giving up your inbox.

Ready to plan it for real?

Once you have a target budget, RenoWise gives you a fully transparent project — itemised quote, photo updates, and real-time spend tracking. No surprises.